Advice, participation and analysis of HSE impact assessment (HSEIA), project HSE Review (PHSER), Risk Assessment, HAZOP. Review and comments on safety engineering project studies such as, Fire and safety protection/detection systems, Emergency shutdown systems, cause and effect Diagrams and safety philosophy and Hazardous area classification drawings of OGD Phase II project of ADNOC, Parsons Energy & Chemical Group, (London/UK).
- Definition of methodology for safety system design study according to IEC 1508,SSIV location studies, Definition of scope of work and co-ordination of Quantitative Risk Assessment (QRA). Determination of safety critical system and performance standards. Preparation of design safety case HSEQ member of TRITON FPSO, Kvaerner Oil & Gas (Croydon /UK).
- Quantitative SIL Assessment and Safety Critical Elements Determination of TRITON FPSO, Kvaerner Oil & Gas (Croydon /UK).
- Cost benefit analysis and investigation of the effect of communication systems between the FPSO and drilling ring of Pierce field on reduction of dropped object risks of drilling rig, DNV (Aberdeen/UK).
- Determination of the maximum allowable distance of Standby Vessel from Nelson platform, satisfying Regulation 17 of PFEER Regulations and guidance PBN 97/20 of HSE. The calculation of this study has been done by program RESCUE of OHRAT, offshore Toolkit, DNV (Aberdeen/UK).
- Definition of methodology for safety system design study according to IEC 1508, Temporary Refuge Integrity Study, Riser Risk Assessment, Consequence analysis by PHAST, SSIV location studies, Definition of risk acceptance and impairment criteria for project. Definition of scope of work for Quantitative Risk Assessment (QRA). Determination of safety critical system, Exxon Arkutun-Dagi P.A.D Project, KVAERNER Oil & GAS (Croydon, UK).
- Traditional Safety Engineering and Coarse QRA for proposal phase of ELDFISK Project, Kvaerner Oil & Gas (Croydon, UK).
- Review and comment of QRA, PFEER assessment and performance standards, determination of safety critical systems based on selected scenarios in QRA, passive fire protection evaluation based on risk assessment and blowdown study, follow up of HAZOP for Philips Judy-Joanne offshore installation, Prime contractor to Kvaerner H&G (Croydon, UK).
- Propane Leak, Fire & Explosion Modelling and QRA for ZAKUM PROPANE TRANSFER SYSTEM ( Abu Dhabi)
- Fire and Explosion study report, Accident Frequency estimation and Passive Fire Protection evaluation for Eldfisk Project/PHILIPS, Proposal phase, Prime contractor to Kvaerner Oil & Gas (Croydon, UK).
- Fire and Explosion study report, Accident Frequency estimation and Passive Fire Protection evaluation for PELICAN Project/SHELL, Prime contractor to AMEC Process & Energy (London, UK).